ELECTRICAL SYSTEM LOAD PROFILE ON UNIVERSITY OF BANGKA BELITUNG
Abstract
University of Bangka Belitung is currently supplied by PLN Bangka Belitung region with 690 kVA power supply to meet the need of electric energy on campus with total land 153 ha. Through direct measurements on the panels of each building, it is found that the use of power in the morning is higher than the use of power in the afternoon. Total power (3 phases) in the morning ie 194.6425 kW, while in the afternoon 154,0396 kW.
Downloads
References
Berahim, Hamzah. 1995. Diktat Teknik Tenaga Listrik Dasar. Jurusan Teknik Elektro UGM. Yogyakarta.
Wildi,Theodore. 2002. Electrical Machines, Drives and Power Systems 5th ed. Prentice Hall. New Jersey.
Zuhal. 1986. Dasar Tenaga Listrik, ITB, Bandung.
Copyright in each article is the property of the author.
- The author acknowledges that the Jurnal Ecotipe (Electronic, Control, Telecommunication, Information, and Power Engineering) has the right to publish for the first time with a Creative Commons Attribution 4.0 International License.
- The author can enter the writing separately, regulate the non-exculsive distribution of manuscripts that have been published in this journal into other versions (for example: sent to the author's institution respository, publication into books, etc.), by acknowledging that the manuscript was first published in the Jurnal Ecotipe (Electronic, Control, Telecommunication, Information, and Power Engineering);