ELECTRICAL SYSTEM LOAD PROFILE ON UNIVERSITY OF BANGKA BELITUNG

Authors

  • Wahri Sunanda Department of Electrical Engineering, University of Bangka Belitung , Jurusan Teknik Elektro Universitas Bangka Belitung

DOI:

https://doi.org/10.33019/ecotipe.v4i1.11

Keywords:

3 phases, electrical energy, power

Abstract

University of Bangka Belitung is currently supplied by PLN Bangka Belitung region with 690 kVA power supply to meet the need of electric energy on campus with total land 153 ha. Through direct measurements on the panels of each building, it is found that the use of power in the morning is higher than the use of power in the afternoon. Total power (3 phases) in the morning ie 194.6425 kW, while in the afternoon 154,0396 kW.

Downloads

Download data is not yet available.

References

Berahim, Hamzah. 1995. Diktat Teknik Tenaga Listrik Dasar. Jurusan Teknik Elektro UGM. Yogyakarta.

Wildi,Theodore. 2002. Electrical Machines, Drives and Power Systems 5th ed. Prentice Hall. New Jersey.

Zuhal. 1986. Dasar Tenaga Listrik, ITB, Bandung.

Published

25.04.2017

How to Cite

[1]
W. Sunanda, “ELECTRICAL SYSTEM LOAD PROFILE ON UNIVERSITY OF BANGKA BELITUNG”, JurnalEcotipe, vol. 4, no. 1, pp. 1–6, Apr. 2017, doi: 10.33019/ecotipe.v4i1.11.

Most read articles by the same author(s)